RFP/DB: MSC EV Charging Stations & BESS
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Design, construction, and installation of Electric Vehicle (EV) Charging Stations and Battery Energy Storage Systems (BESS) at the City s Municipal Service Center (MSC) located at 1993 Rancho Conejo Blvd, Thousand Oaks, CA 91320. scope of work will cover the installation of EV chargers, BESS, natural gas generators, electrical wiring, and conduits to convey energy to new EV charger electrical pane
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Energy Storage, Commercial, Automotive, Natural Gas, Electric Vehicles (EVs), Power Generation (CCGT), Government
- Location
- Thousand Oaks, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/DB: MSC EV Charging Stations & BESS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding, pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design, construction, and installation of Electric Vehicle (EV) Charging Stations and Battery Energy Storage Systems (BESS) at the City s Municipal Service Center (MSC) located at 1993 Rancho Conejo Blvd, Thousand Oaks, CA 91320. scope of work will cover the installation of EV chargers, BESS, natural gas generators, electrical wiring, and conduits to convey energy to new EV charger electrical panels and to and from new BESS at MSC, along with the necessary infrastructure for grid connection a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Thousand Oaks |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Energy Storage, Commercial, Automotive, Natural Gas, Electric Vehicles (EVs), Power Generation (CCGT), Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
