logo
ProjectClosed

RFP/DB: North Bulkhead Berths 1-6 Realignment

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Design-Build-Finance Services for the North Bulkhead Berths 1-6 Realignment Project - PortMiami is reconstructing and realigning the 7,168-foot length of the North Bulkhead due to the advanced deterioration of the existing steel sheet pile structure. Numerous holes and gaps have developed over time in the existing 50+ year old bulkhead resulting in the loss of backfill material and the formation o

Status
Closed
Sector
Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Commercial, Metal
Location
Miami, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/DB: North Bulkhead Berths 1-6 Realignment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/DB: North Bulkhead Berths 1-6 Realignment” is an infrastructure initiative in the Water Supply and Storage sector, located in Miami, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design-Build-Finance Services for the North Bulkhead Berths 1-6 Realignment Project - PortMiami is reconstructing and realigning the 7,168-foot length of the North Bulkhead due to the advanced deterioration of the existing steel sheet pile structure. Numerous holes and gaps have developed over time in the existing 50+ year old bulkhead resulting in the loss of backfill material and the formation of voids in the apron area creating hazards to operations and other unsafe conditions. The scope o...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Miami

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Waste Processing and Treatment, Government, Commercial, Metal

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project