logo

RFP/DB: Replacement of Pedestrian Overpass

Sector: Government • Location: New York, United States of America

Source: Dodge USA

Project
Closed

Open Ad: RK-90 Design-Build Services for FDR Widening to 116th St. and Replacement of Pedestrian Overpass at 120th St. Description of Goods or Services to Be Bid: This Design-Build project will reconfigure the merge between the two southbound lanes of the FDR Drive and the two entrance lanes from the Harlem River Lift Span of the RFK Bridge. Currently these four lanes transition to three lanes thr

Status
Closed
Sector
Government, Road, Manufacturing (Industrial), Bridge, Commercial
Location
New York, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/DB: Replacement of Pedestrian Overpass

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/DB: Replacement of Pedestrian Overpass” is an infrastructure initiative in the Government sector, located in New York, New York, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Open Ad: RK-90 Design-Build Services for FDR Widening to 116th St. and Replacement of Pedestrian Overpass at 120th St. Description of Goods or Services to Be Bid: This Design-Build project will reconfigure the merge between the two southbound lanes of the FDR Drive and the two entrance lanes from the Harlem River Lift Span of the RFK Bridge. Currently these four lanes transition to three lanes through a short, non-standard center-lane merge. This project will carry the four southbound lanes t...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

New York

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Road, Manufacturing (Industrial), Bridge, Commercial

Article published date

2024-12-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project