RFP/DB: Solar & Energy Infrastructure Project
Sector: Cable car • Location: Corona, California, United States of America
Source: Dodge
Electric Substation, Power Plant (Other). Low Bidders on GC - 5 bids received - Award within 30 days - Bid September 17
- Status
- Prospective
- Sector
- Cable car, Solar, Wind, Telecommunications, Biomass, Power Transmission, Residential, Water Supply and Storage, Road, Steel, Commercial, Waste Processing and Treatment, Metal, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Cement, Rail, Government
- Location
- Corona, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/DB: Solar & Energy Infrastructure Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results, pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Electric Substation, Power Plant (Other). Low Bidders on GC - 5 bids received - Award within 30 days - Bid September 17 |
Original sector | Energy And Extractives |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Corona |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cable car, Solar, Wind, Telecommunications, Biomass, Power Transmission, Residential, Water Supply and Storage, Road, Steel, Commercial, Waste Processing and Treatment, Metal, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Cement, Rail, Government |
Article published date | 2026-10-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cable car projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- QLINE Streetcar Overhead Catenary System
- BART Earthquake Safety Project
- WMATA Electrician Labor Contract
- Platinum Triangle CFD Information
- Regional Infrastructure Accelerator Program Notice of Funding Opportunity
- Science and Technology Centers: Integrative Partnerships
- Office of Elementary and Secondary Education (OESE): Impact Aid Discretionary Construction Grant Program Assistance Listing Number 84.041C
