logo
ProjectClosed

RFP/DB: Solar Facility REBID

Closed · British Columbia · Last reported Apr 2022

Source: Dodge USA

design and build a Solar Facility in Summerland, BC consisting of a solar photovoltaic ( PV ) system coupled to a battery energy storage system ( BESS ) and interconnected to a distribution facility owned and operated by the District (the Project). The Project is expected to have the following characteristics: PV DC system size: 0.4 to 0.6 MW; BESS size: 1 to 2 MWAC with usable energy equal to or

Status
Closed
Sector
Commercial, Energy Storage, Power Generation (CCGT), Solar, Government
Location
Summerland, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/DB: Solar Facility REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/DB: Solar Facility REBID” is an infrastructure initiative in the Commercial sector, located in Summerland, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

design and build a Solar Facility in Summerland, BC consisting of a solar photovoltaic ( PV ) system coupled to a battery energy storage system ( BESS ) and interconnected to a distribution facility owned and operated by the District (the Project). The Project is expected to have the following characteristics: PV DC system size: 0.4 to 0.6 MW; BESS size: 1 to 2 MWAC with usable energy equal to or greater than 2 MWh without augmentation over the first 20 years; BESS and PV system are AC couple...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Summerland

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Energy Storage, Power Generation (CCGT), Solar, Government

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project