logo
ProjectClosed

RFP/DB: South Campus Parking Structure

Closed · Utah · Last reported Mar 2024

Source: Dodge USA

Design Build services for South Campus Parking Structure at Utah State University. Includes a 5-tier parking terrace with a minimum of 343 stalls and South Campus Drive with associated utilities, stormwater, and Landscaping Design Build services for South Campus Parking Structure at Utah State University. Includes a 5-tier parking terrace with a minimum of 343 stalls and South Campus Drive with as

Status
Closed
Sector
Commercial, Water Supply and Storage, Car parking, Education, Power Transmission, Waste Processing and Treatment, Automotive, Power Generation (CCGT)
Location
Logan, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/DB: South Campus Parking Structure

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/DB: South Campus Parking Structure” is an infrastructure initiative in the Commercial sector, located in Logan, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design Build services for South Campus Parking Structure at Utah State University. Includes a 5-tier parking terrace with a minimum of 343 stalls and South Campus Drive with associated utilities, stormwater, and Landscaping Design Build services for South Campus Parking Structure at Utah State University. Includes a 5-tier parking terrace with a minimum of 343 stalls and South Campus Drive with associated utilities, stormwater, and Landscaping

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Logan

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Car parking, Education, Power Transmission, Waste Processing and Treatment, Automotive, Power Generation (CCGT)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project