RFP/DB: Terminal 2 Upstream Soil Improvements
Sector: Water Supply and Storage • Location: Portland, Oregon, United States of America
Source: Dodge
Design-Build Services for Terminal 2 Upstream Soil Improvements. The work includes Providing a deep soil mixing (DSM) buttress 500 feet long (parallel to the river) by 105 feet wide (perpendicular to the river), and extending a minimum of 2 feet into the underlying gravel and cobble deposit; site preparation, including saw cutting and removal of existing pavement, track removal, and underground ut
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Design-Build Services for Terminal 2 Upstream Soil Improvements. The work includes Providing a deep soil mixing (DSM) buttress 500 feet long (parallel to the river) by 105 feet wide (perpendicular to the river), and extending a minimum of 2 feet into the underlying gravel and cobble deposit; site preparation, including saw cutting and removal of existing pavement, track removal, and underground utility demolition; reconstruction of underground utilities; management of excavation and DSM spoil... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
