RFP/DB: Trinity School Pump Station Upgrade
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The proposed upgrade to the Trinity Building (formerly the 7th Day Adventist) Pump Station will include replacement of most of the infrastructure related to the existing facility. The improvements will include a duplex pumping system for improved reliability. In addition, critical operating data will be brought back to the SCADA System for remote monitoring. Due to the size and relative simplicity
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial)
- Location
- Frederick, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/DB: Trinity School Pump Station Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed upgrade to the Trinity Building (formerly the 7th Day Adventist) Pump Station will include replacement of most of the infrastructure related to the existing facility. The improvements will include a duplex pumping system for improved reliability. In addition, critical operating data will be brought back to the SCADA System for remote monitoring. Due to the size and relative simplicity of this project, it is recommended for designbuild, starting in FY-25, and will include the foll... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Frederick |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
