logo

RFP/DB: Wedge Creek Bridge Design-Build Replacement

Sector: Forest Products and Packaging • Location: Whistler, British Columbia, Canada

Source: Dodge USA

Project
Request For Proposals

New clear span cable suspension brid ge to replace an existing timber recreation bridge located over Wedge Ck. T his bridge is a key part of the Comfortably Numb Trail in Whistler BC. The existing 22m log stringer bridge, has reached its end of life and requires removal and replacement with a new long lasting and low maintenance, cable suspension bridge. Proponents are encouraged to align their de

Status
Prospective
Sector
Forest Products and Packaging, Telecommunications, Bridge, Commercial, Government, Road
Location
Whistler, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/DB: Wedge Creek Bridge Design-Build Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/DB: Wedge Creek Bridge Design-Build Replacement” is an infrastructure initiative in the Forest Products and Packaging sector, located in Whistler, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Request for Proposals

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

New clear span cable suspension brid ge to replace an existing timber recreation bridge located over Wedge Ck. T his bridge is a key part of the Comfortably Numb Trail in Whistler BC. The existing 22m log stringer bridge, has reached its end of life and requires removal and replacement with a new long lasting and low maintenance, cable suspension bridge. Proponents are encouraged to align their designs with th e areas recreational use and natural site characteristics while ensuring th e effic...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Whistler

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Forest Products and Packaging, Telecommunications, Bridge, Commercial, Government, Road

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project