RFP/DEV: Douglas County Non-Congregate Shelter Construction
Closed · Georgia · Last reported Aug 2025
Source: Dodge
Developer for Non-Congregate Shelter Construction, New construction of an 11 Unit, common areas, and offices for a non-congregate shelter The selected Developer will be responsible for: Full construction of the shelter facility Coordination with architects, engineers, and permitting authorities Compliance with HUD HOME ARP regulations and local building codes Ensuring ADA accessibility and energy
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Residential, Commercial, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/DEV: Douglas County Non-Congregate Shelter Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Developer for Non-Congregate Shelter Construction, New construction of an 11 Unit, common areas, and offices for a non-congregate shelter The selected Developer will be responsible for: Full construction of the shelter facility Coordination with architects, engineers, and permitting authorities Compliance with HUD HOME ARP regulations and local building codes Ensuring ADA accessibility and energy efficiency standards Site preparation, infrastructure, and utility connections Project management... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Residential, Commercial, Power Generation (CCGT) |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
