RFQ/AE: 119th Street Arterial Mill and Overlay
Sector: Water Supply and Storage • Location: Olathe, Kansas, United States of America
Source: Dodge
Designed improvements will include 2 milling and asphalt resurfacing, asphalt base repairs (as needed), spot concrete curb and gutter replacement, sidewalk widening (8 -10 width), ADA ramps, and pavement markings. Design services will include survey of existing conditions, utility coordination, acquisition documentation (title reports, surveyed exhibits, easement documents, etc.) needed for any ri
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Road, Government, Cement, Manufacturing (Industrial), Automotive
- Location
- Olathe, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/AE: 119th Street Arterial Mill and Overlay
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Designed improvements will include 2 milling and asphalt resurfacing, asphalt base repairs (as needed), spot concrete curb and gutter replacement, sidewalk widening (8 -10 width), ADA ramps, and pavement markings. Design services will include survey of existing conditions, utility coordination, acquisition documentation (title reports, surveyed exhibits, easement documents, etc.) needed for any right-of-way or easements, developing construction plans in accordance with Olathe design standards... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Olathe |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Road, Government, Cement, Manufacturing (Industrial), Automotive |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
