logo
ProjectClosed

RFQ/AE: 2024 Water Main Replacement

Closed · Washington · Last reported Feb 2024

Source: Dodge USA

Engineering and Design services for Water main replacement. Project include 1) NE 86th B/W HWY 99 & 8th Ave: Replace approximately 800 LF of 4 & 6 water main within NE 86th street with 8 water main to meet current fire flow and capacity standards 2) NW 109th St & NW 13th Pl: Replace approximately 515 LF of 6 water main within NW 109th Street with 12 water main for distribution 3) NE 190/192st Ave,

Status
Closed
Sector
Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment
Location
Vancouver, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFQ/AE: 2024 Water Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/AE: 2024 Water Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Vancouver, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Engineering and Design services for Water main replacement. Project include 1) NE 86th B/W HWY 99 & 8th Ave: Replace approximately 800 LF of 4 & 6 water main within NE 86th street with 8 water main to meet current fire flow and capacity standards 2) NW 109th St & NW 13th Pl: Replace approximately 515 LF of 6 water main within NW 109th Street with 12 water main for distribution 3) NE 190/192st Ave, 130th -138th + side streets: Replace NE 190th /192th St water mains and side connections with up...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Vancouver

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government, Commercial, Waste Processing and Treatment

Article published date

2024-03-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project