RFQ/AE: 2025 Bond Projects IQC
Sector: Power Generation (CCGT) • Location: Kress, Texas, United States of America
Source: Dodge
A/E to provide services relating to the 2025 Bond Projects. The exact scope of work will be determined following A/E s assessment of the proposed site and District needs and evaluation of cost estimates. . The A/E selected will be required to provide related disciplines necessary to address all design and construction contract administration needs of the work (i.e., electrical, structural, plumbin
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Education, Cable car, Automotive, Telecommunications, Government
- Location
- Kress, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/AE: 2025 Bond Projects IQC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A/E to provide services relating to the 2025 Bond Projects. The exact scope of work will be determined following A/E s assessment of the proposed site and District needs and evaluation of cost estimates. . The A/E selected will be required to provide related disciplines necessary to address all design and construction contract administration needs of the work (i.e., electrical, structural, plumbing, mechanical, civil, geotechnical, engineering surveying, equipment, and etc.). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Kress |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Education, Cable car, Automotive, Telecommunications, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
