RFQ/AE: Angier Elementary School Sidewalk Connection
Sector: Car parking • Location: Angier, North Carolina, United States of America
Source: Dodge USA
Design, environmental document, permitting, and bidding assistance for 5-foot wide sidewalk and cube and gutter along E. McIver Street and S. Wilma Street from the Angier Elementary School to Tanglewood 3 subdivision. Additionally, the project scope will include erosion control, storm drainage and utility relocation work. Design, environmental document, permitting, and bidding assistance for 5-foo
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Angier, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: Angier Elementary School Sidewalk Connection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design, environmental document, permitting, and bidding assistance for 5-foot wide sidewalk and cube and gutter along E. McIver Street and S. Wilma Street from the Angier Elementary School to Tanglewood 3 subdivision. Additionally, the project scope will include erosion control, storm drainage and utility relocation work. Design, environmental document, permitting, and bidding assistance for 5-foot wide sidewalk and cube and gutter along E. McIver Street and S. Wilma Street from the Angier El... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Angier |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Automotive, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
