RFQ/AE: BGIS - CMHC - Transfer Switch Replacement Building C
Sector: Power Generation (CCGT) • Location: Ottawa, Ontario, Canada
Source: Dodge
This project includes replacement of the automatic transfer switches that is used to back up servers in the MER room. Servers in the MER room are backed up by both generators (Caterpillar and Cummins) as the racks are dual powered, one side from Caterpillar generator and one side from Cummins Generator. This item is listed in the 2023 Building Condition Assessment under event number BCA D509002 Pr
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Commercial
- Location
- Ottawa, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/AE: BGIS - CMHC - Transfer Switch Replacement Building C
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes replacement of the automatic transfer switches that is used to back up servers in the MER room. Servers in the MER room are backed up by both generators (Caterpillar and Cummins) as the racks are dual powered, one side from Caterpillar generator and one side from Cummins Generator. This item is listed in the 2023 Building Condition Assessment under event number BCA D509002 Priority 2. |
Budget |
Location
Country | Canada |
State | Ontario |
City | Ottawa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Commercial |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Canada
- Site C Worker Accommodation
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Brock University's Marilyn I. Walker School of Fine and Performing Arts
- Molson Brewery Expansion
- Air Products Hydrogen Plant Civil Construction
- Osgoode Hall Law School
- Toronto Airport Piers D and E Fixed Bridges
