RFQ/AE: Bieber Fire Station/Helitack Base Relocation
Sector: Power Transmission • Location: Bieber, California, United States of America
Source: Dodge USA
Construction Management Services for relocation of the Bieber Fire Station and Helitack Base to nearby property. Project to include construction of a 3-bay apparatus building, a dozer/transport building, a 36-bed barracks/mess hall building and resource management office building, a helicopter hanger, two helicopter pads, a generator/pump/storage building with generator, a 12,000-gallon jet-A fuel
- Status
- Closed
- Sector
- Power Transmission, Residential, Car parking, Commercial, Road, Bridge, Automotive, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Bieber, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: Bieber Fire Station/Helitack Base Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction Management Services for relocation of the Bieber Fire Station and Helitack Base to nearby property. Project to include construction of a 3-bay apparatus building, a dozer/transport building, a 36-bed barracks/mess hall building and resource management office building, a helicopter hanger, two helicopter pads, a generator/pump/storage building with generator, a 12,000-gallon jet-A fuel storage tank and a 4-bay utility parking garage. Project also to include site preparation, utili... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Bieber |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Residential, Car parking, Commercial, Road, Bridge, Automotive, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
