RFQ/AE: Bowan Thomas Park Outfall Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Engineering services for replacing sewer outfalls along both the Bowan Thomas Park and Brushy Fork Branch alignments. The project will consist of replacement of approximately 9,710 linear feet of 12-inch, and 500 linear feet of 18-inch gravity sewer pipe, and the design should follow the existing alignments along Bowen Blvd and Brushy Fork Creek. The selected engineering firm will provide all desi
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Government, Waste Processing and Treatment, Automotive, Commercial
- Location
- Winston-Salem, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: Bowan Thomas Park Outfall Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering services for replacing sewer outfalls along both the Bowan Thomas Park and Brushy Fork Branch alignments. The project will consist of replacement of approximately 9,710 linear feet of 12-inch, and 500 linear feet of 18-inch gravity sewer pipe, and the design should follow the existing alignments along Bowen Blvd and Brushy Fork Creek. The selected engineering firm will provide all designs and documents necessary for permitting, easement acquisition, construction, and bidding. Engi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Winston-Salem |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Government, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
