RFQ/AE: Green Line Tunnel Interlocking Signal Upgrades
Sector: Power Generation (CCGT) • Location: Boston, Massachusetts, United States of America
Source: Dodge USA
Engineering and Design Consulting Services 30%-100%, Bid Phase and Construction Phase Services for the Green Line Central Tunnel Track, Power and Signal Transformation Project. The Green Line Transformation Program (GLT) seeks to optimize system identity and transform the Green Line light rail system to become a prime model of a contemporary, legacy transit system through innovative design, advanc
- Status
- Closed
- Sector
- Power Generation (CCGT), Rail, Road, Tunnel, Commercial
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: Green Line Tunnel Interlocking Signal Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering and Design Consulting Services 30%-100%, Bid Phase and Construction Phase Services for the Green Line Central Tunnel Track, Power and Signal Transformation Project. The Green Line Transformation Program (GLT) seeks to optimize system identity and transform the Green Line light rail system to become a prime model of a contemporary, legacy transit system through innovative design, advanced operation, consistent preservation, and reimagined service. The primary purpose of this projec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Rail, Road, Tunnel, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
