RFQ/AE: HWY 55 infrastructure
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Engineering Services for design the relocation and widening of HWY 55 north of the canyon at approximately MP 51.5 to approximately MP 54.0 and design a grade separated interchange at Avimor Drive. Engineering Services for design the relocation and widening of HWY 55 north of the canyon at approximately MP 51.5 to approximately MP 54.0 and design a grade separated interchange at Avimor Drive.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Road
- Location
- Boise, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: HWY 55 infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering Services for design the relocation and widening of HWY 55 north of the canyon at approximately MP 51.5 to approximately MP 54.0 and design a grade separated interchange at Avimor Drive. Engineering Services for design the relocation and widening of HWY 55 north of the canyon at approximately MP 51.5 to approximately MP 54.0 and design a grade separated interchange at Avimor Drive. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Boise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Road |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
