RFQ/AE: Judicial Center Design
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Provide a recommended scope of work to include: a) Evaluation of existing flooring/subflooring. The flooring structure has several areas with water/termite damage. There are also failed areas that have been improperly repaired in the past and repairs are required. We are seeking a repair plan to address any structural repairs that may be required with the substructure and the installation of a new
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Manufacturing (Industrial), Commercial, Government
- Location
- Wesleyan Col, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/AE: Judicial Center Design
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provide a recommended scope of work to include: a) Evaluation of existing flooring/subflooring. The flooring structure has several areas with water/termite damage. There are also failed areas that have been improperly repaired in the past and repairs are required. We are seeking a repair plan to address any structural repairs that may be required with the substructure and the installation of a new commercial floor covering. b) Evaluation of the current residential style bathroom. This bathroo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wesleyan Col |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
