RFQ/AE: Lost Creek Recycling Center Expansion
Sector: Water Supply and Storage • Location: Wyandotte, Oklahoma, United States of America
Source: Dodge
Wyandotte Nation is requesting the services of a professional Architect/Engineer to oversee the planning and construction of an expansion to the Lost Creek Recycling Center, located at 4 Turtle Drive, Wyandotte, Oklahoma 74370. The construction project will include site preparation, a 1,750 ft expansion to the existing facility, and improvements to include the installation of two large fans, an up
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Wyandotte, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/AE: Lost Creek Recycling Center Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Wyandotte Nation is requesting the services of a professional Architect/Engineer to oversee the planning and construction of an expansion to the Lost Creek Recycling Center, located at 4 Turtle Drive, Wyandotte, Oklahoma 74370. The construction project will include site preparation, a 1,750 ft expansion to the existing facility, and improvements to include the installation of two large fans, an upgrade to LED lighting, raised awning over south side of existing building, infrared heating and r... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Wyandotte |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
