RFQ/AE: Membrane Replacement - Bldgs. 4, 5, 6, & 8
Sector: Commercial • Location: Dayton, Ohio, United States of America
Source: Dodge USA
The project involves the complete removal of the overburden on the plaza areas to include concrete, pavers, landscaping, sod, and soil to expose the waterproof membrane to be replaced. All building and construction seals below grade are included in the project to be replaced to provide a complete waterproof membrane system. The plaza drainage system is included in the scope of this work to possibl
- Status
- Closed
- Sector
- Commercial, Cement, Education, Government, Waste Processing and Treatment
- Location
- Dayton, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: Membrane Replacement - Bldgs. 4, 5, 6, & 8
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the complete removal of the overburden on the plaza areas to include concrete, pavers, landscaping, sod, and soil to expose the waterproof membrane to be replaced. All building and construction seals below grade are included in the project to be replaced to provide a complete waterproof membrane system. The plaza drainage system is included in the scope of this work to possibly include some drain line replacements as necessary. The new plaza surface is to match the existi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Dayton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Education, Government, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
