RFQ/AE: New Surface Water Treatment Plant
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Both surface water (SW) and groundwater (GW) supplies are required to meet the Town s total water supply needs in accordance with our Integrated Management approach to water supply. The need for SW supply has become more apparent since testing in 2020 has shown that three of the existing groundwater supplies have less sustainable capacity than originally estimated, about 1.0 million gallons per da
- Status
- Closed
- Sector
- Government, Commercial, Waste Processing and Treatment, Water Supply and Storage
- Location
- Exeter, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: New Surface Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Both surface water (SW) and groundwater (GW) supplies are required to meet the Town s total water supply needs in accordance with our Integrated Management approach to water supply. The need for SW supply has become more apparent since testing in 2020 has shown that three of the existing groundwater supplies have less sustainable capacity than originally estimated, about 1.0 million gallons per day (MGD) while current peak demand is about 1.6 MGD. The Town is moving forward with development o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Exeter |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
