RFQ/AE: Reflective Pond Up-Grade & Repairs
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Dodge USA
GOC1960593-CT: An investigative study conducted in March 2018 identified problems related to water leaks, flow issues, and poor water circulation in the pond. Concerns of poor water quality along with leaks in the existing membrane have left the pond unusable.
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: Reflective Pond Up-Grade & Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | request for qualifications |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GOC1960593-CT: An investigative study conducted in March 2018 identified problems related to water leaks, flow issues, and poor water circulation in the pond. Concerns of poor water quality along with leaks in the existing membrane have left the pond unusable. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
