RFQ/AE: Salt Storage Facility Project
Sector: Raw Materials • Location: Addison, New York, United States of America
Source: Dodge
Engineering Consultant Services to perform planning, design, and construction phase consulting services for the Town of Rathbone Salt Storage Facility Project. Engineering Services to perform planning, design, and construction phase consulting services for the Town of Rathbone Salt Storage Facility Project.
- Status
- Closed
- Sector
- Raw Materials, Warehouse, Commercial, Consumer Products, Government
- Location
- Addison, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/AE: Salt Storage Facility Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering Consultant Services to perform planning, design, and construction phase consulting services for the Town of Rathbone Salt Storage Facility Project. Engineering Services to perform planning, design, and construction phase consulting services for the Town of Rathbone Salt Storage Facility Project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Addison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Warehouse, Commercial, Consumer Products, Government |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
