logo

RFQ/AE: State Street Resurfacing REBID

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Project
Closed

The State Street Resurfacing project involves hot-mix asphalt surface removal and replacement with polymerized leveling binder and hot-mix asphalt surface course, spot curb and gutter removal and replacement, driveway, sidewalk, ADA detectable warnings removal and replacement, where necessary, and thermoplastic striping. The project limits are from 127th Street to Cass Street. Engineering firms to

Status
Closed
Sector
Car parking, Road, Automotive, Government, Commercial
Location
Lemont, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFQ/AE: State Street Resurfacing REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/AE: State Street Resurfacing REBID” is an infrastructure initiative in the Car parking sector, located in Lemont, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The State Street Resurfacing project involves hot-mix asphalt surface removal and replacement with polymerized leveling binder and hot-mix asphalt surface course, spot curb and gutter removal and replacement, driveway, sidewalk, ADA detectable warnings removal and replacement, where necessary, and thermoplastic striping. The project limits are from 127th Street to Cass Street. Engineering firms to provide Preliminary (Phase I), Design (Phase II), and Construction (Phase III) Engineering Servi...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Lemont

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Road, Automotive, Government, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project