RFQ/AE: Varn Lake Loop Road Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Civil Engineering, Topographic and Geotechnical Survey for Varn Lake Loop Road Improvements. Improve approximately 3200 LF of gravel road around Varn Lake at the McCrady Training Center, Widen roadway, improve base course, install Asphaltic Concrete surface, provide parking areas for cabins and improve drainage structures. Civil Engineering, Topographic and Geotechnical Survey for Varn Lake Loop R
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Rail, Road, Water Supply and Storage, Automotive, Commercial, Cement
- Location
- Columbia, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/AE: Varn Lake Loop Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Civil Engineering, Topographic and Geotechnical Survey for Varn Lake Loop Road Improvements. Improve approximately 3200 LF of gravel road around Varn Lake at the McCrady Training Center, Widen roadway, improve base course, install Asphaltic Concrete surface, provide parking areas for cabins and improve drainage structures. Civil Engineering, Topographic and Geotechnical Survey for Varn Lake Loop Road Improvements. Improve approximately 3200 LF of gravel road around Varn Lake at the McCrady Tr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Columbia |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Rail, Road, Water Supply and Storage, Automotive, Commercial, Cement |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
