RFQ/AE: Washington St. Preservation
Sector: Water Supply and Storage • Location: Sumner, Washington, United States of America
Source: Dodge USA
Consulting firms with expertise in providing professional services in the area of civil engineering and municipal public works Projects in utility design and roadway design services for the preparation of engineering design plans, specifications, cost estimates, and construction bid documents for the roadway reconstruction and the replacement of water, sewer, and storm utilities on Washington St.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT)
- Location
- Sumner, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: Washington St. Preservation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Consulting firms with expertise in providing professional services in the area of civil engineering and municipal public works Projects in utility design and roadway design services for the preparation of engineering design plans, specifications, cost estimates, and construction bid documents for the roadway reconstruction and the replacement of water, sewer, and storm utilities on Washington St. between Wood Ave and McMillan Ave. Services are expected to last 7 months with the option for the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Sumner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Waste Processing and Treatment, Commercial, Power Generation (CCGT) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
