RFQ/AE: WWTF Biosolids Equipment Modernization
Sector: Water Supply and Storage • Location: Sumner, Washington, United States of America
Source: Dodge USA
Pre-construction design services, furnishing biosolids drying equipment, delivery of this equipment to the project location, post-construction inspection and startup services, and all other services as required to provide a complete and workable biosolids drying system. Consultant to prepare an engineering report to serve as the facility plan amendment for the wastewater treatment facility biosoli
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Sumner, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE: WWTF Biosolids Equipment Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pre-construction design services, furnishing biosolids drying equipment, delivery of this equipment to the project location, post-construction inspection and startup services, and all other services as required to provide a complete and workable biosolids drying system. Consultant to prepare an engineering report to serve as the facility plan amendment for the wastewater treatment facility biosolids equipment modernization. Required work may include: 1) a plan to replace various equipment nec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Sumner |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
