logo

RFQ/AE:AZ/DOT: Golden Hill Rd Sidewalk IQC

Sector: Cement • Location: Globe, Arizona, United States of America

Source: Dodge

Project
Closed

This is a local project sponsored by the Town of Superior. The project scope includes a 6-foot wide concrete sidewalk along the west side of Panther Drive between US 60 and Sunset Drive, a distance of approximately 6,000 linear feet. The project also includes a 1.5-foot wide rolled concrete curb and gutter, eleven ADA ramps with handrails, and crosswalks at the intersections. Proposed drainage imp

Status
Closed
Sector
Cement, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial
Location
Globe, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFQ/AE:AZ/DOT: Golden Hill Rd Sidewalk IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/AE:AZ/DOT: Golden Hill Rd Sidewalk IQC” is an infrastructure initiative in the Cement sector, located in Globe, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This is a local project sponsored by the Town of Superior. The project scope includes a 6-foot wide concrete sidewalk along the west side of Panther Drive between US 60 and Sunset Drive, a distance of approximately 6,000 linear feet. The project also includes a 1.5-foot wide rolled concrete curb and gutter, eleven ADA ramps with handrails, and crosswalks at the intersections. Proposed drainage improvements consist of a swale with riprap along the sidewalk. This is a local project sponsored by...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Globe

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project