RFQ/AE/CM: Val Vista Transmission Main Rehabilitation
One of 10,000+ projects Taiyo tracks in Arizona.
Source: Dodge USA
Engineering services and Construction Manager at Risk for 12,400 linear feet of steel slip-lining pipe rehabilitation along various locations of the Val Vista Transmission Main with an inside diameter of 96 inches. Services may include design and possible construction administration and inspection services. The project is located at various sites from Lindsey Road and McDowell Road to 48th Street
- Status
- Closed
- Sector
- Water Supply and Storage, Education, Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- Phoenix, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/AE/CM: Val Vista Transmission Main Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering services and Construction Manager at Risk for 12,400 linear feet of steel slip-lining pipe rehabilitation along various locations of the Val Vista Transmission Main with an inside diameter of 96 inches. Services may include design and possible construction administration and inspection services. The project is located at various sites from Lindsey Road and McDowell Road to 48th Street north of University Drive. Engineering services for 12,400 linear feet of steel slip-lining pipe ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Education, Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
