RFQ/CM: Acosta Operations Center
Sector: Power Generation (CCGT) • Location: Los Angeles, California, United States of America
Source: Dodge
CMAR for Acosta Operations Center.The proposed scope of work includes the interior demolition of six vacant offices (121A, 121B, 121C, 121D, 121E, and 121F), totaling 2,321 asf; construction of new interior partitions; installation of new doors, flooring, ceilings, and wall finishes; modifications to the mechanical, electrical, fire sprinkler, and fire alarm systems to support the new program; acc
- Status
- Closed
- Sector
- Power Generation (CCGT), Residential, Education, Commercial
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/CM: Acosta Operations Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CMAR for Acosta Operations Center.The proposed scope of work includes the interior demolition of six vacant offices (121A, 121B, 121C, 121D, 121E, and 121F), totaling 2,321 asf; construction of new interior partitions; installation of new doors, flooring, ceilings, and wall finishes; modifications to the mechanical, electrical, fire sprinkler, and fire alarm systems to support the new program; accessibility upgrades to two adjacent Restrooms (114A and 114B); and installation and integration o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Residential, Education, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
