RFQ/CM: Cottonwood Creek Reach
Sector: Water Supply and Storage • Location: Colorado Springs, Colorado, United States of America
Source: Dodge
Request for Proposal for Cottonwood Creek Phase 2 Construction Management & Inspection Services. The Cottonwood Creek Phase 2 project will repair and stabilize approximately 4,500 linear feet of Cottonwood Creek starting around the Powers Blvd crossing and going west, downstream. The channel through this section has experienced increased erosion leading to downcutting leaving vertical banks along
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Raw Materials, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Fertilizers
- Location
- Colorado Springs, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/CM: Cottonwood Creek Reach
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Request for Proposal for Cottonwood Creek Phase 2 Construction Management & Inspection Services. The Cottonwood Creek Phase 2 project will repair and stabilize approximately 4,500 linear feet of Cottonwood Creek starting around the Powers Blvd crossing and going west, downstream. The channel through this section has experienced increased erosion leading to downcutting leaving vertical banks along the reach. Improvements will return the creek back to a stable system reducing erosion and protec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Colorado Springs |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Raw Materials, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Fertilizers |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
