logo
ProjectClosed

RFQ/CM: MC Durango Campus Electrical Infrastructure Upgrades

Closed · Arizona · Last reported Jul 2024

Source: Dodge USA

Pre-construction and construction management at risk services for to coordinate and install a new 15,000V electrical service (APS) and associated infrastructure (APS duct banks, pads, transformers, switchboards, etc.) to serve buildings throughout the campus. This system will replace the current 12,470V primary distribution network currently serving most of the campus that is currently owned, oper

Status
Closed
Sector
Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
Location
Phoenix, Arizona, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFQ/CM: MC Durango Campus Electrical Infrastructure Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/CM: MC Durango Campus Electrical Infrastructure Upgrades” is an infrastructure initiative in the Commercial sector, located in Phoenix, Arizona, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pre-construction and construction management at risk services for to coordinate and install a new 15,000V electrical service (APS) and associated infrastructure (APS duct banks, pads, transformers, switchboards, etc.) to serve buildings throughout the campus. This system will replace the current 12,470V primary distribution network currently serving most of the campus that is currently owned, operated, and maintained by Maricopa County. Engineering services for the upgrading the electrical in...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Phoenix

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project