RFQ/CM: Mulberrt Riverwalk Trail Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
CMAR services to be provided under a single contract. The Project consists of, but is not limited to, the following major elements: The installation of approximately 5,000 L.F. of 8-foot-wide gravel slate chip trail with recycled plastic railroad tie side rails, weed control barrier, signage, picnic tables, water fountains, police call boxes, concrete bench pads, and dog waste receptacles. Site wo
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Cement, Commercial, Rail, Waste Processing and Treatment, Government, Manufacturing (Industrial), Car parking, Automotive
- Location
- Braselton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/CM: Mulberrt Riverwalk Trail Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CMAR services to be provided under a single contract. The Project consists of, but is not limited to, the following major elements: The installation of approximately 5,000 L.F. of 8-foot-wide gravel slate chip trail with recycled plastic railroad tie side rails, weed control barrier, signage, picnic tables, water fountains, police call boxes, concrete bench pads, and dog waste receptacles. Site work includes clearing, grubbing, light grading, drainage improvements, and erosion control measure... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Braselton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Cement, Commercial, Rail, Waste Processing and Treatment, Government, Manufacturing (Industrial), Car parking, Automotive |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
