RFQ/CM: UConn Werth Hall Humidity Mitigation Phase 1A
One of 10,000+ projects Taiyo tracks in Connecticut.
Source: Dodge
The project is anticipated to take place from May 2025 through August 2025. The scope of work includes MEP upgrades to AHU's and HVAC distribution to provide dehumidified ventilation air to each of the Peter J. Werth Residence Tower dorm rooms on floors 2-8. The specific scope of work for this bid package includes miscellaneous shaft and partition re-work and miscellaneous concrete work including
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Commercial, Cement, Steel, Metal
- Location
- Ellington, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/CM: UConn Werth Hall Humidity Mitigation Phase 1A
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is anticipated to take place from May 2025 through August 2025. The scope of work includes MEP upgrades to AHU's and HVAC distribution to provide dehumidified ventilation air to each of the Peter J. Werth Residence Tower dorm rooms on floors 2-8. The specific scope of work for this bid package includes miscellaneous shaft and partition re-work and miscellaneous concrete work including CMU patching & repairs. Phase 1A includes electrical, HVAC, roofing and steel required, inclusive... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Ellington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Commercial, Cement, Steel, Metal |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
