RFQ/DB: 5697 CER Energy Storage Upgrade
Sector: Raw Materials • Location: San Diego, California, United States of America
Source: Dodge USA
Design build services for removal of existing 2.5MW Battery System and installation of new 10MW Battery System. The Design Builder shall provide all electrical distribution equipment associated with the installation of the Battery System. The Design Builder shall verify existing power capacity of the selected site, provide and install the Battery System specified by the Center of Energy Research (
- Status
- Prospective
- Sector
- Raw Materials, Energy Storage, Power Generation (CCGT), Consumer Products, Government, Commercial
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/DB: 5697 CER Energy Storage Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding, Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design build services for removal of existing 2.5MW Battery System and installation of new 10MW Battery System. The Design Builder shall provide all electrical distribution equipment associated with the installation of the Battery System. The Design Builder shall verify existing power capacity of the selected site, provide and install the Battery System specified by the Center of Energy Research (CER). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Energy Storage, Power Generation (CCGT), Consumer Products, Government, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
