RFQ/DB: Blue River WWTP Grit Removal
Closed · Missouri · Last reported Jul 2024
Source: Dodge USA
Design Build Services including design, construction, startup and commissioning for the Blue River Wastewater Treatment Plant (WWTP) Grit Removal and Fine Screens. Project include 1) Construction site preparation including hauling and disposing incinerator ash from the entirety of the South Ash Lagoon on Blue River Primary 2) New 270 mgd grit removal facility including flow channels, fine screens,
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
- Location
- Kansas City, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/DB: Blue River WWTP Grit Removal
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design Build Services including design, construction, startup and commissioning for the Blue River Wastewater Treatment Plant (WWTP) Grit Removal and Fine Screens. Project include 1) Construction site preparation including hauling and disposing incinerator ash from the entirety of the South Ash Lagoon on Blue River Primary 2) New 270 mgd grit removal facility including flow channels, fine screens, multi-tray Headcell units, grit removal pumps, and flow splitting structure 3) New grit handling... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Kansas City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2024-07-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
