logo

RFQ/DB: Indian River Estates Phase 3

Sector: Road • Location: Florida, United States of America

Source: Dodge USA

Project
Bidding, Pre-Design

Design-build services for the design and construction of Indian River Estates Phase 3 (Easy Street/Buchanan Drive) Design-build services for the design and construction of Indian River Estates Phase 3 (Easy Street/Buchanan Drive)

Status
Prospective
Sector
Road, Commercial, Government, Manufacturing (Industrial)
Location
Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFQ/DB: Indian River Estates Phase 3

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/DB: Indian River Estates Phase 3” is an infrastructure initiative in the Road sector, located in Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding, Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design-build services for the design and construction of Indian River Estates Phase 3 (Easy Street/Buchanan Drive) Design-build services for the design and construction of Indian River Estates Phase 3 (Easy Street/Buchanan Drive)

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Commercial, Government, Manufacturing (Industrial)

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project