logo
ProjectClosed

RFQ/DB: Sterling Blvd Sidewalk & Shared Used Path Install

One of 10,000+ projects Taiyo tracks in Virginia.

Source: Dodge

This project provides for the design, right-of-way acquisition, and construction of 0.68 miles of sidewalk and shared-use path along the south side of Sterling Boulevard from Shaw Road to Davis Drive. The project includes new or upgraded ADA-compliant pedestrian ramps at three intersections, as required. This project was prioritized as a part of the 2020 Sidewalk and Trail Prioritization Study Lou

Status
Closed
Sector
Road, Car parking, Commercial, Automotive, Government
Location
Sterling, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFQ/DB: Sterling Blvd Sidewalk & Shared Used Path Install

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/DB: Sterling Blvd Sidewalk & Shared Used Path Install” is an infrastructure initiative in the Road sector, located in Sterling, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project provides for the design, right-of-way acquisition, and construction of 0.68 miles of sidewalk and shared-use path along the south side of Sterling Boulevard from Shaw Road to Davis Drive. The project includes new or upgraded ADA-compliant pedestrian ramps at three intersections, as required. This project was prioritized as a part of the 2020 Sidewalk and Trail Prioritization Study Loudoun County may be seeking engineering services for New Sterling Boulevard Sidewalk and Shared Us...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Sterling

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Car parking, Commercial, Automotive, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project