logo
ProjectClosed

RFQ/DB: VA/DOT:I-81 Widening Segment N

One of 10,000+ projects Taiyo tracks in Virginia.

Source: Dodge

Design-Builder for the I-81 CIP Ironto Widening Segment N From: I-81 Mile Marker 133.8 To: I-81 Mile Marker 136.8 .This work includes, among other things all work required to support the design and construction of: (a) roadway; (b) survey; (c) structure and/ or bridge; (d) environmental (e) geotechnical; (f) hydraulics; (g) traffic control devices; (h) transportation management plan; (i) right-of-

Status
Closed
Sector
Water Supply and Storage, Road, Rail, Mass Transit, Bridge, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment
Location
Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFQ/DB: VA/DOT:I-81 Widening Segment N

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/DB: VA/DOT:I-81 Widening Segment N” is an infrastructure initiative in the Water Supply and Storage sector, located in Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design-Builder for the I-81 CIP Ironto Widening Segment N From: I-81 Mile Marker 133.8 To: I-81 Mile Marker 136.8 .This work includes, among other things all work required to support the design and construction of: (a) roadway; (b) survey; (c) structure and/ or bridge; (d) environmental (e) geotechnical; (f) hydraulics; (g) traffic control devices; (h) transportation management plan; (i) right-of-way; (j) utilities; (k) public involvement/ relations (l) quality assurance and quality control; ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Rail, Mass Transit, Bridge, Power Transmission, Power Generation (CCGT), Commercial, Waste Processing and Treatment

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project