RFQ/DB: Water Reclamation Facility Progressive
Sector: Water Supply and Storage • Location: San Marcos, Texas, United States of America
Source: Dodge USA
Design-Build Services for FM 1978 Water Reclamation Facility. The new FM 1978 Water Reclamation Facility is to be designed and built with an initial capacity of at least 2.0 MGD. and expanded to 4.0 and eventually to 8 MGD to service new developments in the surrounding area. In addition to effluent limits for TSS, CBOD5, and Ammonia (as N), we anticipate a total phosphorus limit of no greater than
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Hydrogen, Waste Processing and Treatment, Government, Manufacturing (Industrial)
- Location
- San Marcos, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/DB: Water Reclamation Facility Progressive
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding, Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design-Build Services for FM 1978 Water Reclamation Facility. The new FM 1978 Water Reclamation Facility is to be designed and built with an initial capacity of at least 2.0 MGD. and expanded to 4.0 and eventually to 8 MGD to service new developments in the surrounding area. In addition to effluent limits for TSS, CBOD5, and Ammonia (as N), we anticipate a total phosphorus limit of no greater than 0.5 mg/l. The City of San Marcos is using a progressive design-build alternative delivery to aid... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Marcos |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Hydrogen, Waste Processing and Treatment, Government, Manufacturing (Industrial) |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
