RFQ/DB: Whittier Elementary Replacement
Sector: Car parking • Location: Fircrest, Washington, United States of America
Source: Dodge
This project will involve demolition of the existing WES facilities and construction of a new facility. Construction will include, but is not limited to, new building(s), utilities and infrastructure, on-site/offsite improvements, parking lot, playgrounds and play fields. The new WES will be designed to house approximately 400 students and is anticipated to be approximately 40,000 sf. The existing
- Status
- Closed
- Sector
- Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Education, Government
- Location
- Fircrest, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/DB: Whittier Elementary Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will involve demolition of the existing WES facilities and construction of a new facility. Construction will include, but is not limited to, new building(s), utilities and infrastructure, on-site/offsite improvements, parking lot, playgrounds and play fields. The new WES will be designed to house approximately 400 students and is anticipated to be approximately 40,000 sf. The existing WES staff, students and all school functions will be relocated to an alternative swing school si... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Fircrest |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Power Transmission, Automotive, Power Generation (CCGT), Education, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
