RFQ/ELECTRIAL: Cargo Building 720.1 and GSE Building 742 - D
Sector: Water Supply and Storage • Location: San Francisco, California, United States of America
Source: Dodge USA
This replacement 120,000 square feet, single-story cargo facility has been planned with approximately 95,000 square feet of cargo area, and 25,000 square feet of mezzanine office space along with landside maneuvering depth from West Field Road for approximately 30 trucks. The Project also has an ancillary Ground Service Equipment (GSE) Maintenance Facility (Building 742) of approximately 17,000 sq
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Airport, Manufacturing (Industrial), Commercial, Road, Residential, Power Generation (CCGT), Waste Processing and Treatment, Power Transmission
- Location
- San Francisco, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/ELECTRIAL: Cargo Building 720.1 and GSE Building 742 - D
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This replacement 120,000 square feet, single-story cargo facility has been planned with approximately 95,000 square feet of cargo area, and 25,000 square feet of mezzanine office space along with landside maneuvering depth from West Field Road for approximately 30 trucks. The Project also has an ancillary Ground Service Equipment (GSE) Maintenance Facility (Building 742) of approximately 17,000 square feet on site, but not physically connected, to the cargo facility. In order to construct the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Francisco |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Airport, Manufacturing (Industrial), Commercial, Road, Residential, Power Generation (CCGT), Waste Processing and Treatment, Power Transmission |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
