RFQ/GC: Specialized Bridge Construction Services
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Scope of work includes the installation of an existing bridge strand jacking system connected to the suspension span tower and top chord of stiffening truss, at the east tower, southeast compression link, to temporarily support and relieve load from the existing compression link assembly. Temporary removal of existing compression link pin nuts is required to provide access to the Engineer to obser
- Status
- Closed
- Sector
- Bridge, Road, Commercial
- Location
- Jamestown, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/GC: Specialized Bridge Construction Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work includes the installation of an existing bridge strand jacking system connected to the suspension span tower and top chord of stiffening truss, at the east tower, southeast compression link, to temporarily support and relieve load from the existing compression link assembly. Temporary removal of existing compression link pin nuts is required to provide access to the Engineer to observe conditions of the gusset and reinforcing pin plates. The compression link is to be returned to... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Jamestown |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
