RFQ/GC/SUB: Water Resource Recovery New Facility
Sector: Automotive • Location: West Yarmouth, Massachusetts, United States of America
Source: Dodge USA
The project delivery method for construction will be design-bid-build. The facility will include several structures to accommodate headworks, sequencing batch reactors, ultraviolet disinfection, chemical storage and handling, solids storage and handling, denitrification filters, vehicle storage, and several smaller miscellaneous structures. Work under this Project includes demolition, site prepara
- Status
- Closed
- Sector
- Automotive, Nuclear, Water Supply and Storage, Chemical (Industrial), Commercial, Power Transmission, Waste Processing and Treatment, Car parking, Power Generation (CCGT), Road, Government, Manufacturing (Industrial)
- Location
- West Yarmouth, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFQ/GC/SUB: Water Resource Recovery New Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project delivery method for construction will be design-bid-build. The facility will include several structures to accommodate headworks, sequencing batch reactors, ultraviolet disinfection, chemical storage and handling, solids storage and handling, denitrification filters, vehicle storage, and several smaller miscellaneous structures. Work under this Project includes demolition, site preparation and finishes, construction of infiltration basins, and utility work for the supply of power,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | West Yarmouth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Nuclear, Water Supply and Storage, Chemical (Industrial), Commercial, Power Transmission, Waste Processing and Treatment, Car parking, Power Generation (CCGT), Road, Government, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
