logo

RFQ/PM/AE: Bolts Lake Reservoir

Sector: Water Supply and Storage • Location: Colorado, United States of America

Source: Dodge USA

Project
Closed

Design Professional to support the reconstruction of Bolts Lake Reservoir including the design of new embankment dams (Main Dam and Saddle Dam), reservoir liner, Cross Creek diversion, and Eagle River pump station. The D&A intends to deliver the construction of the Project via a Construction Manager At-Risk (CMAR) project delivery method. The Design Professional will interface with the Integrated

Status
Closed
Sector
Water Supply and Storage, Hydro, Government, Commercial, Waste Processing and Treatment
Location
Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFQ/PM/AE: Bolts Lake Reservoir

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFQ/PM/AE: Bolts Lake Reservoir” is an infrastructure initiative in the Water Supply and Storage sector, located in Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Design Professional to support the reconstruction of Bolts Lake Reservoir including the design of new embankment dams (Main Dam and Saddle Dam), reservoir liner, Cross Creek diversion, and Eagle River pump station. The D&A intends to deliver the construction of the Project via a Construction Manager At-Risk (CMAR) project delivery method. The Design Professional will interface with the Integrated Project Team consisting of the D&A management, the Program Manager, and the CMAR. The scope for t...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Government, Commercial, Waste Processing and Treatment

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project