RFQ/SUB: Ridenbaugh Canal Headworks Modernization Project
Sector: Water Supply and Storage • Location: Boise, Idaho, United States of America
Source: Dodge
The project includes a new Crest Gate Structure, Ogee Wier, and Intake Canal with associated improvements, appurtenances, and supporting electrical and controls systems. Engineering services for the Ridenbaugh Headworks Modernization Project. Project includes to modernize the headworks of the Ridenbaugh Canal diversion by: replacing the existing diversion structure, which uses check boards, with a
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Government, Power Generation (CCGT), Commercial, Waste Processing and Treatment
- Location
- Boise, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFQ/SUB: Ridenbaugh Canal Headworks Modernization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes a new Crest Gate Structure, Ogee Wier, and Intake Canal with associated improvements, appurtenances, and supporting electrical and controls systems. Engineering services for the Ridenbaugh Headworks Modernization Project. Project includes to modernize the headworks of the Ridenbaugh Canal diversion by: replacing the existing diversion structure, which uses check boards, with a new structure that uses pneumatic bladder dams; replacing the existing 550 sediment control stru... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Boise |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Government, Power Generation (CCGT), Commercial, Waste Processing and Treatment |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
