logo

RFS IV Propane-Plus Fractionator

Sector: Rail • Location: Redwater, Alberta, Canada

Source: BOE Report

Project
Under Commissioning

A 55,000 barrels per day propane-plus fractionator at the existing Redwater fractionation and storage complex. The rail facility was placed into service in February 2026, and commissioning of the fractionator is underway, expected to be in service by end of May 2026.

Status
Under Construction
Sector
Rail
Location
Redwater, Alberta, Canada
Updated
22 Jul 2026
Source
BOE Report

ConstructChat

Ask ConstructChat about RFS IV Propane-Plus Fractionator

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “RFS IV Propane-Plus Fractionator” is an infrastructure initiative in the Rail sector, located in Redwater, Alberta, Canada. Taiyo aggregates data on it from BOE Report.

Participants

Not available for this record.

Status

Original status

under commissioning

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 55,000 barrels per day propane-plus fractionator at the existing Redwater fractionation and storage complex. The rail facility was placed into service in February 2026, and commissioning of the fractionator is underway, expected to be in service by end of May 2026.

Original sector

Energy

Location

Country

Canada

State

Alberta

City

Redwater

Source

Source

BOE Report

URL

More Details

Record type

Project

Sector

Rail

Article published date

2026-05-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project