Rhode Island Hospital Utility Line Relocation PH1
Sector: Water Supply and Storage • Location: Providence, Rhode Island, United States of America
Source: Dodge
Relocation of major utility arteries connecting the RIH central power plant to the Ambulatory Patient Center and other buildings on the northern portion of the campus. These existing utility lines are located in several underground duct banks and tunnels. The following utility lines will be temporarily relocated to allow for construction of a permanent underground utility tunnel as part of the Pha
- Status
- Prospective
- Sector
- Water Supply and Storage, Hospital, Tunnel, Power Generation (CCGT), Commercial, Power Transmission
- Location
- Providence, Rhode Island, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Rhode Island Hospital Utility Line Relocation PH1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Relocation of major utility arteries connecting the RIH central power plant to the Ambulatory Patient Center and other buildings on the northern portion of the campus. These existing utility lines are located in several underground duct banks and tunnels. The following utility lines will be temporarily relocated to allow for construction of a permanent underground utility tunnel as part of the Phase 2 work: (i) water for fire protection and general plumbing operations; (ii) heating, ventilati... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Rhode Island |
City | Providence |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hospital, Tunnel, Power Generation (CCGT), Commercial, Power Transmission |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
